Forthcoming Major Roadworks in Wandsworth


Traffic delays likely in the area due to road and lane closures

Wandsworth Plain, Wandsworth
Until August 5th
Some delays likely
Works location: A3
Works description: Scaffolding
Responsibility for works: TfL
Current status: Works started
East Hill, Wandsworth
Until October 13th
Some delays likely
Works location: A3
Works description: Hoarding with marshall control
Responsibility for works: TfL
Current status: Works started
Swandon Way, Wandsworth
Until July 7th
Some delays likely
Works location: A217
Works description: Subway closure
Responsibility for works: TfL
Current status: Works started
Iron Mill Place, Wandsworth
Until December 14th
Some delays likely
Works location: Garratt Lane
Works description: Installation of high voltage electricity cable
Responsibility for works: UK Power Networks
Current status: Works started


Wandsworth Gyratory, Wandsworth One-Way System

Until January 2020

Delays likely Gyratory changes to two-way flow

Works location: - A3 at Frogmore

Works description: Delays possible

Responsibility for works: TfL

Current status: Works started


Water Leaks and Gas Escapes

Do not assume that someone else has phoned it in. Please do not report these to the Council. The following free phone numbers should be used to report leaks

WATER: 0800 714614
GAS: 0800 111999

All utility companies have to prioritise works across our borough as well as other boroughs in south London. The On Street Services team actively monitors works on the public highway and works with utility companies to minimise disruption as much as possible.

For instance via their telephone number, or Mr Don Ogunyemi on Tel No 020 8871 6712, Fax 020 8871 3174, E-mail dogunyemi@wandsworth.gov.uk.

July 4, 2018